Experience

Case Studies

TritonAMI successfully demonstrates Home Area Network (HAN) capability using Sensus Zigbee technology in Winter Park Florida to control A/C and appliances and provided assistance in bringing the third-party OMS software online. View Video

Triton AMI produces $2,000,000 in new yearly revenue for Shreveport, LA requiring only $700,000 in yearly cost for Phase 1-2. Total project costs for Phase 1-3 of $20,000,000 for Galaxy Fixed Base AMI, New CIS/Billing System - EnQuesta System and Software.

TritonAMI upgrades Winter Park Fl Electric and Water Utilities with AMI and Smart Metering capability. This $10,000,000 project is the first of its kind in Florida. The system allows real time monitoring of electric and water meter usage and two-way communication capability to maximize future conservation and utility rate options to its citizens. It is a big step towards providing the citizens of Winter Park access to green power alternatives being developed through the nations new smart meter grid.

TritonAMI hired to install Smart Grid system on Electric, Water and Gas Utilities in New Roads, LA. This is the first utility to install an AMI/Smart Grid system for Electric, Gas and Water in Louisiana. Electric Meters are capable of reverse metering and 10% of meters are equipped with remote disconnect capabilities. Water Meters have the capability to be read hourly and support future MDM software to help manage theft and distribution losses.

Triton AMI hired by Emerald Coast Utility Authority, FL to install Drive-by AMR and 80,000 commercial and residential water meters in less than 1 year. Program included a Neptune Drive-By Automatic Meter Read (AMR) system. TritonAMI praised at Distributech Convention in Tampa, Fl, 2010 for the speed, efficiency and quality of installation for installing all 80,000 meters in less than a year by Steve Burgess, Deputy Director, Customer Service of ECUA (850-476-5110)

Triton AMI – Guaranteed Performance Contract doubles expected revenue for City of Tallulah, LA. Program initially included Master Meter Drive-By, and Water meters change out program for all commercial and residential meters. With the additional self-funded capital Triton AMI was able to engineer and install a new Lime Feeder, replaced sand filters, refurbished & painted two existing water tower tanks, replaced valves, replaced pumps and installed high efficiency motors. (See independent 3rd party report on TritonAMI Tallulah performance)

Triton AMI hired by Ridgeland, MS to get their AMI project on track. Chuck Gautier, City Alderman: "I would like to commend Triton for the outstanding job they performed", "Their people are professional, courteous and patiently worked through complex problems with our billing software and database", "The companies knowledge goes far beyond simple meter installation - the proof is in the results. Revenue has increased to the point the system is not only paying for itself, but we have considered lowering water rates to our customers. Our only regret is not bringing Triton into the process so late in the game. They bring extensive real world knowledge and were able to not only take care of any problem and answer all questions but provided invaluable suggestions and improved the process. I would recommend Triton to any municipality who is considering installing an Advanced Metering Infrastructure" _ Chuck Gautier, Alderman, City of Ridgeland, July 2008.

The Walton County Water and Sewerage Authority serves 14,000 customers – mostly residential. They wanted a turn-key solution so they turned to TritonAMI. General Manager Wendell Geiger spoke highly of TritonAMI’s project manager during the installation saying “We can’t put a price tag on what he was worth,” TritonAMI installed an average of 1,500 meters a week (a rate of about 75,000 a year).

TritonAMI designed the first MDM system to be used strictly for conservation efforts at the East Bay Municipal Utility District in California (Showcased at Utilimetrics and Distributech) and is working closely with the AMI manufacturer with the goal of perfecting the accurate, reliable and secure transmission of hourly data from battery powered pit transmitters housed in harsh environments. This unique project will not only be a model case study for the effects AMI can have on influencing customer conservation behavior but dramatically demonstrate the ability to effectively transmit hourly data from stand-alone, low energy transmissions, in harsh environment that do not have access to the main power in a residential home or commercial facility.